Reply To: Project JFK Ride aka #JFKRide

Home Forums Suicide Slabs Build Pages Project JFK Ride aka #JFKRide Reply To: Project JFK Ride aka #JFKRide

#662

Jason Ballard
Participant

Thanks guys! Updates:

 

Thanks man! Updates. Floor pans cut and welded in…. firewall piece cut and installed (temp) to cover the hole where the factory AC was. I need to mark the Vintage Air lines and take this out.. drill a few more holes.. and then get it powdercoated.

 

Before:

 

After:

 

Firewall:

 

 

My buddy Lee came to the crib to weld in the floor pans.

 

Next – POR-15 the floor plans, finish the wiring, bezel made for the Dakota Digital gauges, get the transmission thrown in, etc. Much more to come!